top of page
Brighton Fire Maintenance Facility

Brighton Fire Maintenance Facility

Brighton, CO

Building a Fire Maintenance Facility

The 9,800 SF Brighton Fire Maintenance Facility, completed in 2018, includes six apparatus bays, fluid storage, offices, gear wash, break room, storage mezzanine, and surface parking, built with a structural block framework and metal joist roof. Symmetry Builders delivered this lump-sum project to support fleet maintenance for Brighton’s fire department. The project required precise coordination to integrate specialized systems like vehicle exhaust extraction. Its robust design ensures long-term durability and operational efficiency. This facility strengthens public safety infrastructure in the region.

Completed Date

2018

Delivery Method

Design-Bid-Build

Building Size

9,800 SF

Owner

Project Duration

10.0 months

Architect

PROJECT GALLERY
i'm an image title
i'm an image title
i'm an image title
i'm an image title
i'm an image title
i'm an image title
i'm an image title
i'm an image title
i'm an image title
bottom of page